Infrastructure

Senator Questions Shift of Tree-Trimming Duties from LUMA Back to PREPA

Published Sep 14, 2026, 4:39 PM ASTvia WAPA TV

At a glance

  • LUMA Energy is contractually responsible for vegetation clearance on power lines
  • PREPA requested the return of eight tree pruning projects worth $42 million
  • The projects would be carried out with the US Army Corps of Engineers

Why this matters: The transfer of tree pruning functions could impact the reliability of Puerto Rico’s power grid, which is still recovering from Hurricane Maria.

Our coverage

Power live: who is out right now, by town

Senator Ángel Toledo raised concerns during a Senate Government Commission public hearing about the transfer of some tree-trimming (vegetation clearance) responsibilities near electrical lines from LUMA Energy back to the Puerto Rico Electric Power Authority (PREPA). Representatives from both LUMA and PREPA appeared at the hearing. Toledo said his office received information indicating that although LUMA is contractually responsible for vegetation clearance along power lines, PREPA requested that eight projects be returned to its control.

According to information obtained by Toledo, PREPA intervened and asked for these eight tree-trimming projects, valued at $42 million, to be handed back to it, with the work to be carried out alongside the U.S. Army Corps of Engineers.

In context (787daily, from public data)

SourceWAPA TV

Our coverage

Power live: who is out right now, by town

More in Infrastructure