Infrastructure

AAA Schedules December Repairs That Will Cut Water Service Across San Juan, Guaynabo and Nearby Towns

Published Nov 24, 2026, 6:34 PM ASTvia El Nuevo Día

Also reported by Metro PR, Telemundo PR and NotiCel.

At a glance

  • The December 1 repair of a 36-inch pipe in the Cupey Water System is estimated at 20 hours and could interrupt service for 41,296 AAA customers in San Juan communities including Cupey, Fairview, Venus Gardens and Los Paseos.
  • The December 7 electrical panel replacement at the Finca Rosso 1 pump station in Guaynabo is estimated at 12 hours and could affect about 8,147 customers with low pressure or outages.
  • The December 14 repair of a 42-inch pipe on PR-834 in Guaynabo’s Río sector is estimated at 16 hours, suspending part of distribution from Finca Rosso 2 and potentially affecting customers in Juncos, Caguas and Gurabo.

Why this matters: For the more than 41,000 Cupey-area accounts alone, the December 1 shutdown means up to 20 hours without piped water, so households and businesses in San Juan and Guaynabo will have to rely on stored water and AAA tanker trucks coordinated with municipal emergency offices.

Our coverage

Water live: reservoirs, rationing plans and your sector

The Puerto Rico Aqueduct and Sewer Authority (AAA) will carry out maintenance and improvement work in San Juan and Guaynabo during December, causing drinking water interruptions of up to 20 hours. The work is part of the maintenance and improvement plan the Metropolitan Region has run since the summer. The AAA says it is a priority to prevent water losses, protect supplies and head off larger failures in the distribution system.

On Tuesday, December 1, crews at the Cupey pump station will repair a leak in a 36-inch pipe of the Cupey Water System, found during a preventive inspection. The repair is expected to take 20 hours, and 41,296 customers in Cupey and surrounding communities, including Fairview, Venus Gardens, San Gerardo, Los Paseos, El Cinco and Lomas del Viento, may lose service.

On Monday, December 7, the final stage of the Finca Rosso 1 pump station reconstruction will replace an electrical panel over an estimated 12 hours. About 8,147 customers in Guaynabo communities such as Santa Rosa I and II, Canta Gallo, Los Burgos and Villas del Río could see low pressure or outages. On Monday, December 14, crews will repair a 42-inch pipe on PR-834, Río sector, Guaynabo, in about 16 hours, suspending part of the distribution from the Finca Rosso 2 pump station.

Customers in Juncos, Caguas and Gurabo communities could see low pressure or temporary interruptions. The AAA will coordinate tanker truck water distribution with the affected towns’ municipal emergency management offices (OMME). It recommends that residents and businesses store enough water for essential needs.

In context (787daily, from public data)

SourceEl Nuevo Día

Follow this story

Our coverage

Water live: reservoirs, rationing plans and your sector

  1. · 787dailyDaily Water Watch: Carraízo Rises to 40.92 m
  2. · 787dailyDaily Water Watch: Carraízo at 40.86 m
  3. · Radio IslaAAA Announces Water Outages in San Juan and Trujillo Alto for Cupey Works
Full timeline

More in Infrastructure