Infrastructure

LUMA Announces $1.2 Million Investment in Old San Juan Electrical Infrastructure Repairs

Published Nov 24, 2026, 9:20 AM ASTvia San Juan Daily Star

Why this matters: Old San Juan’s narrow streets and rooftop wiring mean the 90-plus repairs, timed before January’s Fiestas de la Calle San Sebastián crowds, touch businesses and residents in the historic district that depend on reliable power during the tourism high season.

Our coverage

Power live: 4,178 customers out island-wide at 9:38 PM

LUMA’s chief executive officer, Janisse Quiñones, announced on Monday a $1.2 million investment to carry out more than 90 repairs to the electrical infrastructure of Old San Juan in Puerto Rico. The work begins on San Sebastián Street and surrounding areas and will extend through June 2027. Speaking at a press conference at San Juan City Hall, Quiñones said the project goes beyond replacing deteriorated equipment: it sets new engineering and safety standards that will ease access to the facilities, allow more efficient repairs and help reduce response times in future outages.

She said the first interventions will focus on components that need replacement or rehabilitation before the San Sebastián Street Festivities, scheduled for January, when visitor numbers in the historic zone rise considerably. According to Quiñones, a specialized evaluation of eight distribution feeders found deteriorated or broken poles, leaking transformers and other components needing repair to reduce safety risks.

LUMA will replace poles and structures, rehabilitate primary and secondary lines and conductors, upgrade overhead and underground installations, relocate feeders and install electrical protection equipment. Quiñones noted that Old San Juan’s narrow streets, old buildings and electrical installations on some rooftops call for particular solutions. LUMA developed pole and structure designs adapted to the historic setting, which it expects will make repairs easier and reduce the need to bring large conventional equipment into tight spaces.

In context (787daily, from public data)

SourceSan Juan Daily Star

Our coverage

Power live: 4,178 customers out island-wide at 9:38 PM

  1. · Primera HoraLUMA Begins Modernizing Electrical Infrastructure in Old San Juan with Over 90 Repairs