Coverage timeline

U.S. Army Corps of Engineers

Every story we’ve published that names U.S. Army Corps of Engineers, newest first.

Coverage, newest first

November 2026

Nov 1 to 7
  1. Infrastructure

    Governor Announces $30 Million Vieques-Ceiba 'Short Route' Ferry Link by Summer 2028

    Puerto Rico Governor Jenniffer González announced that, following the signing of an agreement to speed up the rehabilitation of the Mosquito Pier (Muelle Mosquito) in Vieques, the sea crossing between Vieques and the port in Ceiba could be faster by the summer of 2028.

October 2026

Oct 29 to 31
  1. Politics

    Governor González Seeks to Cover 5-Cent Electricity Hike and Push Oversight Board on Sales Tax Relief

    Puerto Rico Governor Jenniffer González said she will keep pressing the Financial Oversight Board to approve a temporary elimination of the sales and use tax (IVU) on prepared food, and announced new measures to ease high electricity costs through the end of the year.

  2. Infrastructure

    Genera PR Takes 'full responsibility' for Outage That Hit About 160,000 Puerto Rico Customers

    Genera PR vice president of Governmental and Public Affairs Iván Báez said the company bears total responsibility for a power outage this week in Puerto Rico that affected about 160,000 people, speaking on Normando en la Mañana.

Oct 22 to 28
  1. Community

    Loíza Mayor Denounces Delays in Coastal Erosion Projects at Parcelas Suárez

    Loíza Mayor Julia Nazario has denounced delays in coastal erosion projects at the Parcelas Suárez community in Loíza, Puerto Rico, where high surf has been threatening homes.

  2. Infrastructure

    Puerto Rico Senate Hears Plans for Vieques Ferry Pier, New Bus Routes and Tren Urbano Study

    Puerto Rico’s Integrated Transportation Authority (ATI) updated the Puerto Rico Senate’s Committee on Transportation, Telecommunications, Public Utilities and Consumer Affairs on ferry fares, port projects and transit expansion at a public hearing on Tuesday.

Oct 15 to 21
  1. Infrastructure

    Coamo Advances 14 Projects Worth $18.3 Million in Construction and Recovery Work

    The town of Coamo, Puerto Rico, is moving forward with 14 simultaneous construction, reconstruction and infrastructure projects totaling $18.315 million, Mayor Juan Carlos García Padilla announced Wednesday.

Oct 1 to 7
  1. Infrastructure

    Fort Buchanan Invests in Microgrid to Enhance Energy Reliability

    The US Army in Puerto Rico, through its administrative structure at Fort Buchanan, revealed it paid $9.8 million to LUMA Energy in the last fiscal year and has begun constructing a microgrid to be completed by 2029.

September 2026

Sep 29 to 30
  1. Community

    Citizens and Environmental Groups Denounce Attempt to Revive Natural Gas Pipeline Idea

    Representatives of several environmental and civic organizations denounced a lack of government transparency around a proposed natural gas pipeline, dusting off the banners they used in 2005 and 2009 to raise their voices again.

Sep 8 to 14
  1. Infrastructure

    Senator Questions Shift of Tree-Trimming Duties from LUMA Back to PREPA

    Senator Ángel Toledo raised concerns during a Senate Government Commission public hearing about the transfer of some tree-trimming (vegetation clearance) responsibilities near electrical lines from LUMA Energy back to the Puerto Rico Electric Power Authority (PREPA).

Sep 1 to 7
  1. Infrastructure

    Army Corps Grants 5-Year Permit for Dry Dredging of Carraízo Reservoir

    The U.S. Army Corps of Engineers (USACE) issued a five-year permit allowing Puerto Rico’s government to carry out dry dredging of the Carraízo reservoir, located between Trujillo Alto and Gurabo.

July 2026

Jul 8 to 14
  1. Infrastructure

    House Committee Advances 2026 Water Resources Development Act with Puerto Rico Provisions

    Puerto Rico’s Federal Affairs Administration (PRFAA) announced that the U.S. House of Representatives’ Transportation and Infrastructure Committee approved the Water Resources Development Act (WRDA) of 2026, bipartisan legislation authorizing water infrastructure projects led by the U.S. Army Corps of Engineers (USACE).

  2. Politics

    Popular Democratic Party Mayors Demand Faster Reconstruction Projects in Washington D.C.

    A dozen mayors from the Popular Democratic Party (PPD) are meeting with US government offices in Washington D.C. to discuss the complications they face with federally funded reconstruction projects, nearly nine years after Hurricane María.

  3. Infrastructure

    Army Corps of Engineers Orders Puerto Rico’s DRNA to Halt Work at Río Grande de Loíza Mouth

    The U.S. Army Corps of Engineers (USACE) issued a cease-and-desist order against Puerto Rico’s Department of Natural and Environmental Resources (DRNA), alleging the agency conducted unauthorized dredging and fill deposit work at the mouth of the Río Grande de Loíza.

Jul 1 to 7
  1. Politics

    Arecibo Flood Control Project Faces Funding Uncertainty as Costs Balloon to $600 Million

    Thirty years after being authorized under the Water Resources Development Act, the flood control project for Arecibo’s Río Grande faces an uncertain future due to lack of funding.

June 2026

Jun 29 to 30
  1. Community

    Camuy Sues DRNA Over Halt to Peñón Brusi Recreational Area Improvement Project

    The Municipality of Camuy has filed a lawsuit against the Department of Natural and Environmental Resources (DRNA) to revoke a stop-work order issued for a project to improve the Peñón Brusi recreational area.

Jun 22 to 28
  1. Politics

    US House to Order Federal Energy Report on Puerto Rico Generation Assets

    The US House of Representatives is set to approve a bill that includes an order to the Department of Energy (DOE) to report on generation assets that can be installed in Puerto Rico within six months and operate for at least two years.

Ask about U.S. Army Corps of Engineers